Smart glass installation in Houston, supported from planning through activation. Switchable film on existing glass or laminated smart glass panels. Request a consultation.
Phase Glass provides switchable privacy glass, retrofit PDLC smart film and laminated smart glass for residential and commercial projects.
Whether it’s switchable film on existing glass or laminated smart glass panels, every installation follows the same path: review, plan, install, activate. With local support at each step.
We assess the space, confirm measurements, and review retrofit film versus laminated panels, controls, electrical needs, and installation conditions.
The film is applied to the interior surface of glazing that stays in place, then connected to a concealed power supply and the controls chosen for the project. Because nothing is demolished or reglazed, film installations in occupied homes and offices are often completed in a single day.
Factory-laminated panels are fabricated to the project’s dimensions and installed like architectural glass, as part of new construction or glazing replacement. We coordinate glazing and electrical directly with your glazier, GC and install team so the switchable glazing lands on schedule.
New to switchable glazing? Start with the smart glass overview for how the technology works and which format fits which project.
Service area: Houston
Retrofit film installations are often completed in a single day. Laminated glass timelines follow the glazing schedule of the project. We confirm the timeline during project planning.
Usually, yes. Switchable film can be applied to most existing glass, often in a single day. New construction and remodels typically use factory-laminated switchable panels.
The application, approximate dimensions, and any plans, photos, or design intent. We review the glass configuration, controls, electrical needs, and installation conditions from there.
Yes. We work directly with your glazier, GC and install team, and support architects, builders, and designers from planning through installation.
The system is installed, tested, and prepared for clear-to-private operation before handover, including the controls chosen for the project.